Dedicated Servers & Cloud Infrastructure for Nashville, TN
Served by OpenMetal’s Ashburn data center — 32.037 ms avg latency to Nashville
Data Center Choices for Nashville Businesses
OpenMetal has a wide range of enterprise dedicated servers available both as bare metal and within a hosted private cloud. For those looking for best dedicated servers for a Nashville based business, we have two data center locations that can serve your purpose.
Ashburn
Average Ping Time: 32.037 ms
Nearest Facility to Nashville
Los Angeles
Average Ping Time: 51.086 ms
Higher latency — suited for redundancy and failover
Latency from Nashville to OpenMetal

Our Data Center Recommendation for Nashville
With an adjusted average latency of 32.037 ms from Nashville to our Ashburn facility, this connection falls within the acceptable range for most enterprise workloads, supporting healthcare IT platforms, EHR systems, SaaS applications, and financial processing common across Nashville’s technology sector
For Nashville businesses in healthcare IT, SaaS, or financial services, OpenMetal’s Ashburn facility delivers dedicated single-tenant infrastructure with comprehensive compliance certifications at predictable monthly pricing.
Detailed Ping Test Results from Nashville
| Data Center | Min (ms) | Avg (ms) | Max (ms) | Mdev (ms) | Adjusted Avg (ms) | Verdict |
|---|---|---|---|---|---|---|
| Ashburn ★ | 26.995 | 27.037 | 27.075 | 0.027 | 32.037 | ACCEPTABLE |
| Los Angeles | 46.064 | 46.086 | 46.104 | 0.014 | 51.086 | SUITABLE FOR THROUGHPUT |
Adjusted avg adds 5 ms to raw avg to account for last-mile network overhead. Test date: March 2026.
Raw Ping: Nashville → Ashburn (173.231.194.20)
--- 173.231.194.20 ping statistics ---
5 packets transmitted, 5 received, 0% packet loss, time 4005ms
rtt min/avg/max/mdev = 26.995/27.037/27.075/0.027 msRaw Ping: Nashville → Los Angeles (216.194.174.6)
--- 216.194.174.6 ping statistics ---
5 packets transmitted, 5 received, 0% packet loss, time 4003ms
rtt min/avg/max/mdev = 46.064/46.086/46.104/0.014 msTraceroute: Nashville → Ashburn
traceroute to 173.231.194.20 (173.231.194.20), 30 hops max, 60 byte packets
1 * *
2 * *
3 be9271.ccr41.ord01.atlas.cogentco.com (154.54.173.126) 10.711 ms 11.083 ms
4 be2766.ccr41.ord03.atlas.cogentco.com (154.54.46.178) 11.007 ms 12.856 ms
5 arelion.ord03.atlas.cogentco.com (154.54.12.38) 10.880 ms 11.308 ms
6 chi-bb1-link.ip.twelve99.net (62.115.140.108) 11.757 ms 11.718 ms
7 nyk-bb5-link.ip.twelve99.net (62.115.139.32) 26.177 ms 26.579 ms
8 rest-bb1-link.ip.twelve99.net (62.115.139.35) 27.272 ms 27.650 ms
9 * ash-b2-link.ip.twelve99.net (62.115.123.123) 27.821 ms
10 198.46.80.118 (198.46.80.118) 27.281 ms 198.46.80.117 (198.46.80.117) 28.131 ms
11 198.46.80.117 (198.46.80.117) 28.058 ms 27.910 ms
12 173.231.194.13 (173.231.194.13) 29.017 ms 28.533 ms
13 173.231.194.20 (173.231.194.20) 27.408 ms !X 26.872 ms !XTraceroute: Nashville → Los Angeles
traceroute to 216.194.174.6 (216.194.174.6), 30 hops max, 60 byte packets
1 * *
2 * *
3 port-channel9266.ccr92.jan02.atlas.cogentco.com (154.54.173.121) 8.241 ms 8.460 ms
4 be8121.ccr31.dfw01.atlas.cogentco.com (154.54.40.249) 15.920 ms be8122.ccr32.dfw01.atlas.cogentco.com (154.54.41.53) 16.085 ms
5 be3821.ccr21.elp02.atlas.cogentco.com (154.54.165.26) 27.270 ms be3846.ccr22.elp02.atlas.cogentco.com (154.54.165.30) 27.508 ms
6 be5471.ccr31.phx01.atlas.cogentco.com (154.54.166.58) 36.146 ms be5473.ccr32.phx01.atlas.cogentco.com (154.54.166.70) 36.390 ms
7 be2932.ccr42.lax01.atlas.cogentco.com (154.54.45.162) 46.318 ms 46.281 ms
8 be3359.ccr41.lax05.atlas.cogentco.com (154.54.3.70) 46.819 ms be3243.ccr41.lax05.atlas.cogentco.com (154.54.27.118) 47.079 ms
9 be9323.rcr71.b004747-3.lax05.atlas.cogentco.com (154.54.86.41) 46.609 ms 46.243 ms
10 edge2-lax2.as22611.net (198.46.92.101) 46.070 ms 46.138 ms
11 edge2-lax2.as22611.net (198.46.92.101) 46.021 ms 45.986 ms
12 198.46.92.17 (198.46.92.17) 46.026 ms 46.022 ms
13 216.194.174.6 (216.194.174.6) 46.104 ms !X 46.271 ms !XAshburn Data Center Specifications
64,723 sq ft facility with 12.6MW critical IT load, N+2 distributed redundancy, power densities up to 22kW per rack, and three diverse fiber entry points.
| Facility | Ashburn, Virginia Data Center |
| Tier | N+2 Redundancy — Distributed redundancy architecture across power, cooling, and network |
| Certifications | SOC1 Type II, SOC2 Type II, ISO 27001, ISO 50001, PCI DSS, NIST 800-53 HIGH |
| Power | 12.6MW critical IT load, N+2 distributed redundancy, up to 22kW per rack |
| Cooling | N+2 redundant cooling |
| Security | 24×7 onsite security, biometric access controls |
| Compliance | NIST 800-53 HIGH, PCI DSS, SOC1/2 Type II, ISO 27001 |
| Network | Three diverse fiber entry points |
Certifications listed above are held by the facility operator. OpenMetal additionally offers HIPAA-eligible infrastructure with BAA support at the organizational level.
Why Choose OpenMetal for Nashville?
OpenMetal’s Ashburn data center delivers dedicated, compliance-ready infrastructure to Nashville at 32.0 ms, meeting the performance and regulatory needs of the city’s healthcare and technology sectors.
Consistent Connectivity for Nashville Operations
At 32.0 ms adjusted latency to our Ashburn facility, Nashville users get reliable performance for healthcare IT platforms, SaaS applications, and financial processing systems. This connection supports the data throughput requirements of electronic health records, claims adjudication, and real-time analytics workloads that define Nashville’s enterprise landscape.
HIPAA and SOC 2 Compliance for Healthcare City
The Ashburn data center facility holds SOC 1/2 Type II, ISO 27001, NIST 800-53 HIGH, PCI-DSS, and HIPAA certifications, directly supporting the regulatory requirements of Nashville’s healthcare-dominated economy. OpenMetal offers HIPAA-eligible infrastructure with BAA support as an organizational commitment, providing the compliance foundation that health IT companies and hospital systems need.
GPU-Ready Infrastructure
Run private AI and ML workloads on dedicated NVIDIA A100 and H100 GPUs. No shared tenancy, no noisy neighbors. Deploy GPU clusters alongside your private cloud and bare metal infrastructure in the same facility.
Deploy in Under a Minute
OpenMetal’s on-demand provisioning delivers production-ready private cloud infrastructure in under 60 seconds. No procurement delays, no sales calls required. Start building immediately.
Cut Costs vs. AWS in Healthcare Infrastructure
Nashville healthcare and SaaS companies running workloads on AWS or Azure face compounding egress charges on large medical imaging transfers, EHR data replication, and analytics pipelines. OpenMetal’s flat monthly pricing includes private network traffic, giving healthcare IT teams and SaaS operators predictable costs that align with the budget discipline Nashville’s health systems demand.
Dedicated Servers & Cloud Infrastructure in Nashville
Nashville, TN has evolved well beyond its music industry roots into one of the fastest-growing technology and healthcare markets in the southeastern United States. The city hosts major healthcare companies including HCA Healthcare, Community Health Systems, and a dense ecosystem of health IT startups, all operating under strict HIPAA compliance requirements. In 2026, Nashville’s expanding fintech sector, logistics operations serving the central U.S. distribution corridor, and a growing base of SaaS companies are driving demand for infrastructure that combines regulatory compliance with predictable costs. Tennessee’s business-friendly regulatory environment attracts enterprises seeking alternatives to hyperscaler pricing, particularly organizations processing protected health information or financial data subject to PCI-DSS and SOX frameworks. OpenMetal’s Ashburn data center provides Nashville businesses with dedicated single-tenant infrastructure at flat monthly rates, eliminating the unpredictable egress fees and shared-tenancy compromises of public cloud platforms while maintaining the compliance posture that healthcare and financial organizations require.
Last updated: March 2026
Suggested Products for Nashville from Our Catalog
Available at the Ashburn facility. Prices shown are estimated monthly costs.
Hosted Private Cloud – Large v4
CPU: 2x Intel Xeon Gold 6526Y
RAM: 512 GB DDR5
Storage: 12.8 TB NVMe SSD
Bandwidth: 4 Gbps
Monthly Price: $5373/mo (3-node cluster)
Bare Metal – Large v4
CPU: 2x Intel Xeon Gold 6526Y
RAM: 512 GB DDR5
Storage: 12.8 TB NVMe SSD
Bandwidth: 4 Gbps
Monthly Price: $1467/mo
GPU Server – NVIDIA A100
CPU: 1x AMD EPYC 7272
RAM: 256 GB DDR4
Storage: 1 TB NVMe SSD
Bandwidth: 20 Mbps
GPU: NVIDIA A100
Monthly Price: $2439/mo
How do I know if a data center location is the right choice?
Choosing the right data center for your workloads depends on latency requirements, compliance needs, and where your users are. For Nashville, OpenMetal’s nearest facility is in Ashburn, approximately 560 miles east-northeast of downtown Nashville.
Our ping test measured an average round-trip time of 27.037 ms (32.037 ms adjusted for last-mile overhead). At this latency, this connection falls within the acceptable range for most enterprise workloads, supporting healthcare IT platforms, EHR systems, SaaS applications, and financial processing common across Nashville’s technology sector
Verdict: ACCEPTABLE For Nashville businesses in healthcare IT, SaaS, or financial services, OpenMetal’s Ashburn facility delivers dedicated single-tenant infrastructure with comprehensive compliance certifications at predictable monthly pricing.
Frequently Asked Questions: Nashville Data Center
Q. Does OpenMetal have a data center in Nashville?
OpenMetal does not have a data center directly in Nashville, TN. The nearest facility is in Ashburn, approximately 560 miles east-northeast of downtown Nashville, which delivers 32.037 ms average latency to Nashville.
Q. What is the ping time from Nashville to OpenMetal’s nearest data center?
The average ping from Nashville to OpenMetal’s nearest data center in Ashburn is 27.037 ms (32.037 ms adjusted for last-mile overhead). A secondary facility in Los Angeles averages 51.086 ms adjusted. These measurements were taken in March 2026.
Q. What OpenMetal dedicated server and cloud options are available for Nashville businesses?
OpenMetal offers Bare Metal Dedicated Servers, Hosted Private Cloud, GPU Servers, and Ceph Storage Clusters for Nashville businesses, all served from the Ashburn facility.
Q. Is OpenMetal’s infrastructure HIPAA compliant for Nashville healthcare deployments?
Yes. OpenMetal offers HIPAA-eligible infrastructure with BAA support, purpose-built for healthcare organizations handling protected health information. The Ashburn data center facility is certified to SOC 1/2 Type II, ISO 27001, NIST 800-53 HIGH, and PCI-DSS standards, meeting the compliance requirements of Nashville’s healthcare companies and health IT providers.
Q. How quickly can OpenMetal deploy infrastructure for Nashville businesses?
OpenMetal can deploy production-ready private cloud infrastructure in under 60 seconds. Bare metal servers are provisioned on-demand with no procurement delays. For Nashville businesses, infrastructure is deployed at the Ashburn facility and accessible immediately.
Ready to Deploy in Nashville?
Schedule a Consultation
Get a deeper assessment and discuss your unique requirements.




































